GP14 tuning guide

GP14s are usually sailed at about 400 lb shroud tension with rake around 21′ 9″–21′ 11″ to the top of the transom, a near-straight mast once the genoa is tensioned, and the mast step at about 2840–2845 mm on Series/Mark 2 boats. Speed and P&B quote tension in lb, while Goacher gives a Loos professional gauge reading (29–29⅓); Speed warns that its roughly 440 lb heavy-air setting strains older boats.

Pinnell & Bax — GP14 Tuning Guide 2025 (PB-HEADOFICEFORMS-TUNINGGUIDES-2025-GP14); older 2011 tuning sheet on gp14.org

Written for
Not stated on the 2025 sheet (the 2011 sheet lists Pinnell & Bax sails); Super Spar M7 (all-up crew 21–24 stone) or Selden Cumulus (19–24 stone)
Tension gauge
Not named (lb)
How it’s measured
Rake from the masthead to the top of the transom with rig tension on; datum: tape to the top of the gooseneck reading 18 (unit not printed; presumably feet), then swing to the transom. Spreader A: from the line between spreader ends perpendicular to the mast track; B: mast side wall to spreader end.
Source
Pinnell & Bax, 2025 (PB-HEADOFICEFORMS-TUNINGGUIDES-2025-GP14); older 2011 tuning sheet on gp14.org

Base setup

Spreaders, Super Spar M7
A 180 mm / B 380 mm
Spreaders, Selden Cumulus
A 180 mm / B 380 mm
Mast foot, Series 1
Heel as far aft in the step as possible
Mast foot, Series 2
2840 mm from the aft centreline point of the transom (through the flaps) to the aft bolt on the mast step
Prebend
About 5 mm at spreader height after setting rake

Rake and rig tension

WindLightMediumHeavy
Mast rake6624–6650 mm6640–6650 mm6640–6650 mm
Rig tension400 lb400 lb350–400 lb

Trim by condition

Rig tension
400 lb in most conditions; add tension as the wind builds until overpowered, then start reducing again (350–400 lb).
Genoa fairleads
Track in the middle of the deck; one hole aft in medium winds; two holes aft in 20+ kn to open the upper leech.
  • The older P&B tuning sheet on the class site (https://gp14.org/wp-content/uploads/2025/03/gp14_PandB_tuning_guide.pdf, file titled 'GP14 Tuning Guide 2011') gives spreaders 375 mm length / 155 mm angle for both masts and only a medium rake of 21′ 9½″–21′ 10″ (light and heavy rake cells blank).

Goacher Sails — Goacher Sails GP 14 Tuning Guide Measured on a 2008 Duffin (through-deck sheeting, Selden mast); PDF created 2010, uploaded to the class site 2025

Written for
Goacher main and genoa (luff wire not sewn in, so genoa luff tension and height are adjustable)
Tension gauge
Loos professional gauge; 400 lb ≈ 29⅓ on their gauge
How it’s measured
Tape on the halyard pulled to the top black band, then to the top middle of the transom. Spreader deflection: straight edge between the shrouds at the tips to the aft face of the mast.
Source
Goacher Sails, Measured on a 2008 Duffin (through-deck sheeting, Selden mast); PDF created 2010, uploaded to the class site 2025

Base setup

Transom to front of gate
2888 mm
Transom to aft face of mast at heel
2830 mm
Mast foot position (transom to aft face)
2820 mm
Transom to shroud
2405 mm
Shroud to shroud
1329 mm
Jib tack pin to shroud
1959 mm
Jib tack to tracks
Back of tracks 2390 mm; front of tracks 2314 mm
Rake
6624 mm (21′ 9½″) at 29 on the Loos professional; mast sits 10 mm out of the gate at this setting
Front face of mast to deck (gate removed)
15 mm
Spreaders
380 mm from the groove; deflection 180 mm (tips to aft face of mast)
Jib tack to deck
50 m (as printed; presumably 50 mm)
Normal tension
400 lb (29⅓ on their Loos gauge)

Trim by condition

Rig tension
Use your own gauge every time and mark the wire height on the mast. Ease in very light, difficult air for genoa luff sag; hold a tight rig in a breeze to keep the genoa flat.
Chocks
Use two 5 mm chocks rather than one 10 mm; a chock in front keeps the mast straighter and the main deeper with a tighter leech. Take one out when you're overpowered and easing mainsheet.
Leech tension
Mainsheet only below about 8 kn; then kicker so the leech telltales stall less than half the time; overpowered, boom end on the quarter with kicker as needed.
Jib cars
Sheet tension matters more than car position; mark sheets to within about 2 mm. Only move cars back when it's very windy and the main is eased over the transom corner.
Cunningham
Under-used: grind it on in a breeze, first thing off in a lull, and re-adjust kicker after (it bends the mast).
Outhaul/inhaul
In light winds ease the outhaul, push the tack up the mast and re-tension to take boom weight off the leech.
  • Two slightly different heel figures are given (2830 mm and 2820 mm transom to aft face of mast).
  • Credited to Andy, Ian and Steve of Goacher Sails.

Speed Sails (Sailboats) — GP14 Tuning Guide (Richard Estaugh) Undated (PDF metadata 2007; class upload 2025; restated on the Sailboats blog)

Written for
Not stated (Speed Sails guide by Richard Estaugh); covers fat-top and slim-top masts
Tension gauge
Not named (lb)
How it’s measured
Hoist the jib at 400 lb, tape 18′ to the top of the gooseneck black band, then measure to the top of the transom. Spreader deflection to the nearest point of the luff groove.
Source
Speed Sails (Sailboats), Undated (PDF metadata 2007; class upload 2025; restated on the Sailboats blog)

Base setup

Spreaders, fat-top mast
Length 360 mm; deflection 155 mm
Spreaders, slim-top mast
Length 380 mm; deflection 150 mm
Mast step, Mark 2
2845 mm straight line from the back of the transom (through the flap) to the aftmost mast-step bolt; Mark 1 boats as far back as possible
Prebend
About ¾″ with the mast held ⅓–½ out of the gate; almost straight once the genoa is up at 400 lb
Rig tension
400 lb normally; 350 lb below 10 kn; 300 lb in a drifter; about 440 lb above 20 kn (careful on older boats)
Mast rake
21′ 9″–21′ 11″ (author sails at 21′ 9½″)
Genoa tack
As low as possible, directly on the bow plate; with everything set, the clew sits about 3″ from the fairlead

Trim by condition

Genoa sheet
Bar tight in medium and heavy air; ease in ½″ steps as the crew moves in, about 1″ with the crew in the middle and up to 2″ with the crew to leeward in very light air.
Genoa fairleads
Sheet line through the clew should nearly bisect the clew angle, aimed slightly more at the leech; one hole back above 15 kn, two holes back in 20+ kn; without through-deck sheeting, tracks in the middle of the deck.
Mainsail hoist
To the bottom of the black band; about ½″ below it in light winds.
Kicker
Slack out in very light air; top telltale flying about 80% as it builds; above 15 kn it's the power control.
Cunningham
Only from 15 kn, to remove some luff creases; never fully; never downwind.
Outhaul
To the band upwind, except up to 1″ ease in very choppy 10–12 kn; reaching ease 1½–2″ (tight on a close spinnaker reach, 2½″ on a planing two-sail reach); running ½″.
Spinnaker
Stopper knot so the head flies about 3″ from the mast; tack and clew level; fairleads at the widest point of the boat.
  • Sailboats' blog page (https://sailboats.co.uk/blogs/guides-and-blogs/gp14-tuning-guide-by-sailboats-speedsails) now restates these numbers in text and arranges them in its own wind-band table (300 lb drifting, 350 lb under 10 kn, 400 lb 10–20 kn, about 440 lb over 20 kn), crediting Richard Estaugh's Speed Sails guide.

Settings are summarised from each sailmaker’s published guide (checked 2026-11-02). Use the guide written for your sails, check it against the full guide, and stay inside the class rules.

Technical

GP14 resource centre

How we verify parts

Fit verified
Each part listed here was matched to the GP14 by part number against the builder’s specification or a manufacturer’s class guide, then checked again by an independent reviewer.
Class rules
Fitting a part is not the same as it being legal for racing. Read the current GP14 class rules before changing equipment, and ask your class measurer if a part is not original equipment.