One-design race shop · Dinghy

Vaurien Race Shop

Everything you need to prepare, compete, and win.

Shopping for

Vaurien

  • 22 verified parts
  • 9 brands
  • Fit checked Nov 2026

Fit verified for Vaurien

All Vaurien equipment

22 parts

Can’t find a part for your Vaurien? Request a Vaurien part

Go fast

Vaurien tuning guide

Vaurien rig tension is set by the jib halyard, rake is measured masthead to transom with the jib tensioned, and mast bend low down is controlled with chocks at the partners (removed to depower). The only numeric setup we found is the class association's rigging guide, written around North sails and a 130 kg crew; it deliberately gives no shroud-tension figure because readings vary with wire type.

AS Vaurien France (Pablo Cabello Vieitez) — Guía de montaje – Cap 1: Montando el palo (Fixation et réglage du mât) and Cap 3: Montando el foque Updated July 2009; French translation October 2010

Written for
North sails, crew about 130 kg
Tension gauge
None given (the author says the right figure depends on the shroud wire)
How it’s measured
Tape hoisted on the main halyard to the masthead, jib tensioned and chocks in place, measured from the mast to the transom. More jib halyard tension lengthens the measurement.
Source
AS Vaurien France (Pablo Cabello Vieitez), Updated July 2009; French translation October 2010

Base setup

Rake (base)
6.06 m masthead to transom, jib tensioned, chocks in
Spreader length
Normally 38–46 cm; 42 cm in the example
Spreader opening
84 cm (with 42 cm spreaders) as a starting point for a 130 kg crew with North sails
Shroud tension
No number; at minimum the leeward shroud should stay taut when sailing

Trim by condition

Rake correction
If rake reads much longer (e.g. 6.20 m) at your tension, release the jib, drop the shroud attachment one hole, re-tension and re-measure; if it then reads about 6.11 m, drop another half hole; at about 6.07 m accept it and judge the boat's behaviour on the water.
Mast chocks
Tension the jib hard so the mast bends forward, then fill the gap in front of the mast at the partners. Little wind and sea: mast as straight as possible for depth and power (don't let it invert). Strong wind: remove chocks to let the mast bend and flatten the main. Flat water with no waves (e.g. lakes): a little bend (fewer chocks) also pays.
Partners
Shim the mast sideways in the partners too (about 1 mm clearance).
Spreader stops
Fit a pin to stop the spreaders swinging forward, to avoid mast failures in strong wind.
Jib halyard
Tensions the whole rig; a 2:1 (doubled) halyard halves the halyard load. Jib foot should sit on the deck.
Jib cunningham
On upwind for a flatter jib with the foot on the deck; released offwind so the jib lifts and deepens (can be led to release automatically when the spinnaker sheet is cleated).
Barber hauler
Optional; the author used it to bring the lead forward and close the leech of his North jib in strong wind.
  • A rigging/setup guide by a class sailor rather than a sailmaker; it says the settings are a starting point that is never wrong but can be improved.
  • Jib chapter: https://www.asvaurien.fr/documents_asvaurien/pdf/guidechap4foc.pdf

Settings are summarised from each sailmaker’s published guide (checked 2026-11-02). Use the guide written for your sails, check it against the full guide, and stay inside the class rules.

Technical

Vaurien resource centre

How we verify parts

Fit verified
Each part listed here was matched to the Vaurien by part number against the builder’s specification or a manufacturer’s class guide, then checked again by an independent reviewer.
Class rules
Fitting a part is not the same as it being legal for racing. Read the current Vaurien class rules before changing equipment, and ask your class measurer if a part is not original equipment.