One-design race shop · Dinghy

RS Vareo Race Shop

Everything you need to prepare, compete, and win.

Shopping for

RS Vareo

  • 22 verified parts
  • 8 brands
  • Fit checked Nov 2026

Fit verified for RS Vareo

All RS Vareo equipment

22 parts

Can’t find a part for your RS Vareo? Request a RS Vareo part

Go fast

RS Vareo tuning guide

The RS Vareo has a simple rig with no adjustable rake, so tuning is outhaul, cunningham, kicker and mainsheet settings, fore-and-aft trim and asymmetric spinnaker handling. The class association's tips (last updated 2005) are the only published guidance we found, and they give few numbers.

RS Vareo Class Association (RS Association) — Vareo Tips Last updated May 2005 (earlier editions Feb 2004 and May 2003)

Written for
RS Vareo mainsail and asymmetric spinnaker
Tension gauge
Not applicable
How it’s measured
Outhaul as the gap between sail and middle of the boom; mainsheet as boom position and the gap between the rearmost mainsheet blocks. Mark the mast (cunningham), boom end (outhaul) and kicker line with tape at minimum and maximum so settings can be repeated.
Source
RS Vareo Class Association (RS Association), Last updated May 2005 (earlier editions Feb 2004 and May 2003)

Base setup

Outhaul
About 8″ between sail and middle of the boom; about 6″ for lightweight helms; tighter if really windy
Mainsheet upwind
Boom end roughly over the transom corner, about 12–18″ between the rearmost mainsheet blocks; sheeting much harder is slow
Spinnaker tack
Tie the tack just outboard of the tack-line knot so it sits within a couple of inches of the pole end when set

Trim by condition

Outhaul systems
With the original 2:1 system the outhaul is hard to adjust without going head to wind, so set it for the beat and leave it. With the 4:1 system now allowed, pull it tight when overpowered and let it off downwind.
Cunningham
From medium tension to really tight on the beats depending on wind; slacken offwind.
Kicker
Take up the slack when beating. When really windy, pull the sheet in hard for a moment so you can tighten the kicker further, and release it before the windward mark. If tired or overpowered, a slacker kicker lets the head twist off and makes the boat less sensitive to gusts. Medium tension reaching, light tension downwind, more downwind if the boat rolls.
Tacking in breeze
If you go into irons, build speed and turn further; otherwise ease the kicker before the tack and re-tension afterwards.
Boat trim
Keep the boat flat; in strong winds sit opposite the main block. Sit forward to keep the wide, flat stern out of the water, especially in light air (a longer tiller extension helps); move back in strong winds to keep the bow up and plane offwind. In very light air a little leeward heel helps the spinnaker fill.
Spinnaker
Hoist with the boat flat and kicker and cunningham eased, sailing low with the main ready to ease. Keep the luff on the curl; play main and kite together (main sheet over the kite sheet in the same hand). Planing: heat up to plane then bear away as deep as speed allows; not planing: sail as low as possible, with slight windward heel.
  • Mostly fit-out and handling tips; there is no wind-by-wind settings table.
  • The 2003 and 2004 editions (rsvareo.org/documents/tuning/RSVareoTips2003.pdf and RSVareoTips2004.pdf) carry the same outhaul and mainsheet figures; the 2005 edition used here also has the boat-trim section.

Settings are summarised from each sailmaker’s published guide (checked 2026-11-03). Use the guide written for your sails, check it against the full guide, and stay inside the class rules.Rig tension gauges for the RS Vareo

Technical

RS Vareo resource centre

How we verify parts

Fit verified
Each part listed here was matched to the RS Vareo by part number against the builder’s specification or a manufacturer’s class guide, then checked again by an independent reviewer.
Class rules
Fitting a part is not the same as it being legal for racing. Read the current RS Vareo class rules before changing equipment, and ask your class measurer if a part is not original equipment.